Our solution
Dominion was introduced to the project by word of mouth, and from the very first conversation, the Bradford Bulls commercial team knew it was dealing with a partner that was flexible yet focused.
Having identified that a bespoke suspension frame would be needed to hang the banner correctly, Dominion quoted for this transparently and built it into the solution – an additional scope that the original supplier had missed entirely. Rather than returning the brief to the client and waiting when time was of the essence, the team proactively rebuilt the artwork files to the standard required for large-format reproduction, ensuring every element would reproduce crisply and clearly at full scale across a 67m x 4.7m span.
With both issues resolved, attention then turned to production, engineered for visual impact and long-term durability. The finished mesh banner – produced as a single piece with one carefully managed join – featured reinforced hems with heavy-duty eyelets, rope stitched into the hem for added strength, and 12 dragon tails welded to the reverse to keep the display secure and taut in all weather conditions.
Within two days of artwork approval, the banner was produced, delivered, and installed on site to meet the project’s exceptionally tight turnaround. The scale of the installation required specialist access equipment, meticulous planning, and a four-person crew to ensure the banner was positioned accurately, tensioned correctly, and completed safely.